    Part 14.
           _______________________________________________________________


The first thing to do was to remove the molded louver on each side of the stack 
so it can be replaced by a new PE louver.


I use my motor tool with a fine grit grinding ball and set on a medium speed.


And most of it gone,


The new PE louver in place.


The floor on the searchlight platform will be replaced with a new from PE parts, so more cutting [smile]


And finished,


Another of the stack’s platforms was replaced with a new PE build.




I secure all the PE parts with thinned Gator glue that I let flow around all parts.


Next to do was the top of the funnel, all the small vent pipes was not hollow so I was
forced to drill them out.


one small drill and a 
steady hand fix the problem [wink]


and done.


after the drilling was it time to do all the smoke dividers, all parts from PE,






There was a lot of PE parts on the stack and here is one of the handrails put in place.


And finally have we a finished stack, with all the PE parts in place except the railings that I
will glue in place after the stack is painted as I did on the bridge.






Now shall I move over to the spray bay and get some airbrushing done and hopefully will it be shorter to the next part this time [wink]

See you soon [smile]

  [wave]
Stefan